Owner
Town of Stillwater
66 School and East Street
Stillwater, NY 12170
(518) 644-6148
Engineer
Chazen Engineering
547 River Street
Troy, NY 12180
(518) 273-0055
Contract Amount
$1.5 million
Scope of Work
Furnished and installed two new 20 ft. deep prefabricated sanitary sewer pump stations with 3,500 ft. of 10″ PVC sanitary sewer forcemain, yard piping, connection to existing SCADA system, air relief manholes, 36 ft. bore beneath two sets of railroad tracks and necessary restorations to the disturbed streets as well as lawn areas.